Extension Builds · Liverpool & Merseyside

Single & Double Storey ExtensionsDesigned, Built & Signed OffAcross Liverpool & Merseyside

Rear, side-return and wrap-around extensions delivered as one contract — foundations to plaster, building control coordinated, planning support included. Fixed price, fixed programme.

Foundations to plaster typically 10–16 weeks on a single-storey rear.

16 yrs joinery experienceFireQual certifiedFully insured (£5m PL)Companies House #15212735Surveys booked in 5–7 days
Service Overview

Extension Builds — what's actually involved

What it is

An extension build is the construction of new habitable floor area attached to an existing property — single-storey rear or side, two-storey rear, wrap-around L-shape, or front porches. The job runs from groundworks (foundations, oversite, drains) through superstructure (masonry or timber frame), roof, windows and doors, services, plaster, joinery, kitchen and decoration. We act as principal contractor on the whole job.

Who it's for

Families needing more living space, downsizers upgrading the home they intend to retire in, landlords adding bedrooms to lift HMO income, and any homeowner whose ground floor doesn't work — the classic Victorian narrow kitchen, the dated 1960s lean-to, the disconnected dining room. Extensions are the most common way to add the space modern living needs without leaving the area.

When you need it

When the existing footprint is restricting how the family lives — kitchen too small for a table, no downstairs WC, no utility, no real connection to the garden. Also when the existing structure (old single-skin lean-to, leaking flat roof, condensing wet kitchen) is failing and replacement makes more sense than repair.

Why professional matters

Extensions are the most regulated and the most expensive home improvement most clients ever undertake. Done badly — wrong foundations for the soil, undersized steels, leaky roof junctions, condensation traps in poorly-insulated walls — they devalue the property and create 20-year problems. Done properly, they add 20–30% to the value and transform how the house lives.

What happens if it's ignored

The cost of leaving it — or getting it wrong

Cheap quotes with wrong foundations

Soil type and tree proximity dictate foundation depth and design (NHBC chapter 4.2). A 'standard' trench-fill quote without a site investigation is a future subsidence claim. We get the soil right or we don't quote.

Roof junctions that always leak

Where a new flat or pitched roof meets the existing house, the lead flashing detail is critical. Done with mortar fillets or skimped lead, it leaks within 2–3 winters.

Cold bridges and condensation traps

Modern thermal regs (Approved Doc L) demand continuous insulation around openings, in cavities and at floor/wall junctions. Skipping the insulation between blockwork and cill creates a cold bridge that grows mould.

Permitted Development overruns and planning enforcement

Many extensions go ahead under Permitted Development — but PD has strict limits (depth, height, ridge, materials). Exceeding them is enforceable. We check PD against your specific deeds and conservation status before designs are signed.

Our Process

A defined system — so you know exactly what happens next

  1. Step 1

    Feasibility & planning support

    Site visit, feasibility on permitted development or planning, indicative cost band. We coordinate architect, structural engineer and planning consultant — or work to your existing drawings.

  2. Step 2

    Detailed quote & programme

    Once drawings and engineer's pack are complete, we issue a fixed price broken down by package (groundworks, superstructure, roof, windows, services, finishes) with a week-by-week programme.

  3. Step 3

    Groundworks & superstructure

    Foundations dug, inspected by building control, concreted. Oversite, drains, DPC. Masonry or timber-frame superstructure with cavity insulation. Roof on, building watertight.

  4. Step 4

    First fix, plaster & second fix

    Electrics, plumbing and heating first-fixed. Insulation and plasterboard. Plastered. Kitchen or other internal works second-fixed. Windows and doors fitted (FENSA-registered partner).

  5. Step 5

    Building control sign-off & decoration

    Final building control visit, completion certificate, electrical cert, FENSA cert. Decoration, snag, deep clean. 12-month workmanship guarantee, structural warranty available on larger projects.

The benefits

What you get when D2 delivers the job

One contractor, one contract

Architect, engineer, contractor and trades coordinated by us. You don't manage subcontractors.

Fully compliant build

Building control sign-off, FENSA certificates, Gas Safe certificates — the pack a buyer's solicitor wants to see.

Significant value uplift

Typical single-storey rear extension on a Liverpool 3-bed semi: 15–25% value uplift, often more than the build cost.

Fixed quote, no surprises

Fixed price tied to the engineer's drawings. Variations only at your written approval — never sprung on you.

Designed for how the family lives

Sightlines from kitchen to garden, sockets where appliances actually go, lighting layered for cooking and entertaining. We design with you.

12-month workmanship + structural warranty

12 months on our workmanship. Optional 10-year structural warranty (LABC or CRL) available on larger schemes.

In Detail

Materials, methods and the situations they suit

Extensions vary by footprint, structure and complexity. Below are the four most-built extension types in Liverpool and Merseyside, with the technical detail that makes the difference.

Single-storey rear extension

Typically 3–6m deep across the rear of a Victorian terrace or 1930s semi. Cavity-wall masonry or timber-frame superstructure on trench-fill or strip foundations. Flat roof in EPDM or GRP, or pitched roof with rooflights. Bifold or sliding doors to garden. The most common extension type — adds open-plan kitchen-diner-living space. 10–16 weeks.

Side return infill (Victorian terraces)

Filling in the narrow side passage on a Victorian terrace — turns a 2.4m kitchen into a 4.5m+ kitchen-diner. Roof typically a glazed lantern or skylight for daylight in the new space. Party-wall agreements required for both neighbours. 8–12 weeks.

Wrap-around (rear + side return)

Combining a rear and side return into an L-shape. Creates a generous open-plan ground floor with three external walls of glazing potential. Steel beams over the original kitchen wall removal. Usually requires planning permission (exceeds PD limits in most cases). 14–20 weeks.

Two-storey rear extension

Doubles the value of a rear extension — kitchen-diner downstairs and bedroom or larger bathroom upstairs. Foundations need to be deeper and wider; party-wall awards needed for terraces and semis; planning permission required in most cases. Highest-value extension type per square metre. 16–22 weeks.

Foundations, steels and structural design

Foundation depth driven by soil type, tree roots and existing structures — typically 1m–2.5m trench fill for Liverpool clay soils, deeper near mature trees. Steel beams sized by structural engineer to the loads above, with bearing details onto padstones. Wind-post connections at new-to-old junctions to prevent cracking. We get the engineer in at quote stage so the price reflects what the build actually needs.

Frequently Asked

Extension Builds — your questions answered

Single-storey rear (4m x 5m, standard finish): £55k–£85k. Side return: £40k–£70k. Wrap-around: £85k–£140k. Two-storey rear: £100k–£170k. All depend on spec — kitchen and bifolds are the major variables.
D2 Joinery FireQual-certified fire doors and bespoke joinery services across Liverpool and Merseyside

Get a feasibility visit and indicative quote.

Free across Liverpool & Merseyside. Honest answer on what's achievable, with a realistic budget — within 7 days.

Free survey & fixed quote · No call-out fee · Reply within one working day · £5m public liability